Exciting Upcoming Projects

Following the agreement of terms and exchange of contracts we are very pleased to announce the following upcoming ‘all / part of site’ projects:

 

Eurocolour – Based in Hemel Hempstead, EUROCOLOUR supplies high quality automotive paints and ancillary products to the Commercial industrial and domestic trades.

Ridgeway Co-Extrusion Technology – A privately owned company – Was founded in 1990 – To develop and market multi-layer die head technology specifically Designed for the production of tube and pipe.

Triad Timber Components Ltd – Triad Timber Components specialise in the design, production and supply of structural timber components which include Trussed Rafters, Posi Joist & I-joist Roof and Floor System and Timber Frame Structures.

Masterford – At Masterford Ltd, we carry out a range of sheet metal work services for private individuals and commercial businesses. Our range of services includes welding, powder coating, prototype work and design along with iron and silk screening.

Pact Engineering – Pact offers a wide range of modern Sub-contract engineering services. State of the art equipment in harness with a highly skilled workforce gives us the ability to supply challenging, complex and difficult to make components and products with extremely close tolerances.

3DCNC – Established in 2008 3D Cnc Ltd has one simple aim – To offer the highest quality components at the most competitive price to our customers

Contact


⌂ Greenlight LED
Arena Centre, Nimrod Way
Ferndown Dorset BH21 7UH
✆ 01202 862679
info@CommercialLedLightingInstallers.uk

Business Hours


Monday-Friday: 9am to 5.30pm
Saturday: Closed
Sunday: Closed

Benefits Include:


Professional uncomplicated advice and support in the complex world of finance.

✅ Free feasibility survey

✅ Up to 80% reduced lighting costs

✅ 100% funding available*

Recently Completed

Securikey

Aldershot

Securikey – Established in 1973, Securikey has been a trusted partner to many UK companies and institutions, supplying a comprehensive range of innovative safety and security products which meet even the most demanding of environments and specifications.

“Aside from generating a huge saving on our utility bill, thank you for making such a remarkable transformation to our premises …. Awesome!”

Ian Smith – Director Securikey

Adstral

Swindon Wiltshire

Adstral – We provide a cost-effective, multi-channel, order fulfilment service for delivery throughout the UK, as a gateway to Europe and for Trans-continental shipping

“We are very pleased”

S Murray – Finance Director Adstral

Aerco

Horsham west Sussex

Aerco – is a stockist and distributor of electrical components, supplying manufacturers and service companies within the aerospace, defence, medical, industrial, rail and transportation markets throughout the world.

Phoenix Aerospace Excellence

Crawley West Sussex

Phoenix Aerospace Excellence – in aerospace design, system integration and installation. A total solutions provider for today’s airborne project

Nythe Farm Kitchen

Taunton

Nythe Farm Kitchen – Here at Nythe farm kitchen we believe that only the best is good enough for our customers. This means that whether you are a small independent deli or sandwich shop, or a large multinational you will appreciate the care we take to source only UK farm assured chicken

Level Best Solutions

Edenbridge in Kent

Level Best Solutions – Interiors Fit-Out Specialists, first formed in 2000. We specialise in Suspended Ceilings, Doors and Partition & Glazing systems.

LTI Metaltech

Oxford

LTI Metaltech – specialises in the precision fabrication and welding of high performance vessels and structures. Our solutions are used in a number of demanding regulated industries, including cryogenic pressure vessels for the healthcare sector. Our success is derived from our ability to listen to the challenges being faced by our customers and turn these into high spec fabricated products.

Manutech

Ferndown Dorset

Manutech Manufacturing Ltd – an engineering company specialising in in the manufacture and assembly of bespoke equipment. We have experience in the educational and food industry, as well as medical, fibre optic, vacuum, Aerospace, university R&D products and marine transducers.

PDQ Airspares

Fordingbridge
PDQ Airspares – one of Europes leading Total Consumable Solution providers to the Airline and MRO Industry, for Airbus and Boeing Consumables

Precision Products

Brighton
Precision Products (Brighton) Ltd – renowned as specialist manufacturers of high quality precision CNC turned parts for customers Worldwide.

OnSite

Bournemouth
Onsite Support Ltd – a leading safety supply company, supplying PPE to the industry. We offer Nationwide Next Day delivery and Same Day London delivery.

Rug Doctor

Worthing
Rug Doctor – Carpet care experts with over 40 years’ experience in 3,300 outlets.

CT Production

CT Production – At CT Production you are at the forefront of everything we do which means that we will tailor a service to suit your needs. 

Yellowstone Environmental

Shaftesbury
Yellowstone Environmental – a SME in the heart of England that provides turnkey solutions to the safe disposal and recycling of hazardous waste

Poole Bay Warehousing

Wimborne
Poole Bay Warehousing – an independent transport, warehousing and distribution company and members of the pallet network

Q Logistics

High Wycombe

Q Logistics – a focused logistics partner for your business. Providing the critical solutions that extend your enterprise to become an integrated part of your supply and delivery operations.

Full site upgrade 33% return on investment with 32 tons of CO2 saved per year.

Focus SB

Hastings

Focus SB – Designer and Luxury Switch-plate Manufacturer are a UK-based electrical accessories manufacturer supplying designer and high quality switch and socket plates for high-end residential, luxury hotels and commercial interiors.

Full site upgrade to Napier Road facility  Carried out with minimal disturbance to normal working. 10 tons of annual CO2 savings and greatly improved lighting

Very happy, the lights are looking good”

Andrew Lanworn Finance Manager & Company Secretary

The Original Gauge Company

New Milton Hampshire

Original Gauge Co Ltd.- Original Gauge has over 80 years experience in manufacturing internal and external thread gauges and providing UKAS calibration services across the UK.

A complete overhaul of the existing lighting was required by the client. Greenlight LED were chosen as the contractor to carry out the works during normal hours of operation. With little disturbance the project was completed in only two days and the customer suffered no ‘down-time’ or loss of activity

Modular Heating Systems

Basildon, Essex

Offering the latest designer radiators for traditional and contemporary interiors

download

“I would say that Greenlight made the process hassle free from start to finish and the result is a transformed office and warehouse. Excellent job!”

Martin Smith – Company Secretary – MHS Radiators Ltd

Tecan

Weymouth
Global provider of automated laboratory instruments and solutions.
“An excellent service professionally delivered”

Terry Smith – Facilities Manager – Tecan

Tenable Screw Company

London

Leading precision turned parts manufacturer offering prototype to mass production using the latest CNC machining technology and equipment.

homeimg2

“Green Light have given us good service and a very positive result”

Clive Halden – General Manager – Tenable Screw Company

Aurora World

Basingstoke Hampshire

Keen to improve lighting in and around new warehouse racking, the client invited Greenlightled to tender for the upgrade project.

After reviewing the ROI projections Aurora management were eager to maximise the savings available from LED technology. As such Aurora chose to include all warehouse areas in the final upgrade.

The works were completed in two weeks without interruption to the client and as in the case of many site-wide upgrades the improvement was dramatic and the savings considerable

download (1)

Pascoe International Limited

Southampton Hampshire

Having the opportunity to work with such a prestigious company meant a great deal to our organisation and we were determined to ensure the client was delighted with the outcome.

images

Picture

The client needed excellent uniformity across several units. Greenlight-LED ensured the light level and colours matched to meet this need and worked around the ongoing works to ensure minimum disturbance to the highly skilled boat building teams.

“A truly first class service, thank you”.

Richard Watson CEO Pascoe International Ltd.

Hampshire Electroplating

Southampton Hampshire

Hampshire Electroplating – is a dedicated and reliable surface finishing specialist for industrial and commercial industries.

Greenlight-LED were asked to upgrade all administration and associated areas to not only improve lighting quality but also reduce power consumption

All works were completed during normal working hours and with no disturbance to the work schedule. The client was very pleased with the outcome

I thought your service from start to finish was nothing short of excellent and would recommend your company to anyone wanting to upgrade their lighting”.

Nick Arnold -Director – Hampshire Electroplating

Blaker Specialised Welding Repairs

Billingshurst West Sussex

As  a result of a recommendation from a previous client we were extremely pleased to have been selected to upgrade the whole site using high quality 5500k Non-Corrosive Battens.

The works took place during the normal working week with minimal disturbance to the client. The installation was finished ahead of schedule and in the words of a senior member of the management staff

“We have seen the light and are very pleased with the results”

Linet UK

Fareham Hampshire

We were delighted to have won the contract to upgrade the whole of the Linet Segensworth facilities. Replacing a range of existing fluorescent units resulted in significant savings and a dramatic improvement in light quality

LINET UK was founded in 2007 as a subsidiary of LINET spol s.r.o, a major European manufacturer of hospital and nursing beds. The company’s portfolio includes solutions designed for intensive care, products for regular in-bed treatment and also special beds for old people’s homes and long-term care facilities. Greenlight-LED upgraded the whole site with minimum disturbance in less than a week. The benefits were immediately obvious with significant improvements in specialised de-contamination areas

Linet Administration Offices

IMG-20170517-WA0003

We are extremely pleased with the outcome and would have no hesitation in recommending Greenlight-LED to other potential clients”                      

Neil Dymott Operations Manager

Westcode UK Ltd

Calne Wiltshire

Westcode are a industry leading engineering company supporting the rail industry. It was important to the client to ensure their facilities were maintained in pristine condition to facilitate maintaining the high standards their customers have grown to expect. This included upgrading to a superior LED lighting system which gave a better quality light whilst dramatically cutting costs and reducing the environmental impact

The image shows the project part completed

Mid-Installation

“Westcode facility is looking good with the light upgrade, we are pleased with the results”.    

Jake Cousins Factory Manager

AC Welding

Hemel Hempstead Hertfordshire

A complete facility upgrade to be completed during working hours

A smaller but much valued project to upgrade aging T12 and T8 fluorescent lighting

The project was completed within a single day and the client was amazed at the change in the working environment

“Thank you all at Greenlight. I am thrilled at the results and would recommend you to any potential client” 

Andrew Chapman  MD

MMP Electrovibe

Havant Hampshire

A complete replacement of the existing lighting system to reduce cost and boost light levels

The whole project was completed ahead of schedule and the customers requirements were not only met but exceeded. Key areas had the lighting levels increased by 200% whist still achieving an overall 57% R.O.I.

The customer was extremely pleased with the outcome

IMAG0425

Plasma Quest Ltd

Hook Hampshire

A full site project with an emphasis on light quality

The customers requirements were fully met and the savings equated to a 68% annual saving on running costs

IMAG0409

Herald Graphics

Reading Berkshire

Another ‘whole of site’ upgrade we were delighted to have won.

Installed over the Christmas shutdown and an additional weekend so as to keep disruption to an absolute minimum, the client was delighted with the results

herald

” All clean, bright and clear at Herald !”   

 Peter Rixon – M.D. Herald Graphics

AMI Marine

Southampton Hampshire.
A slightly more unusual installation because as well as upgrading the whole of the lighting system there were a large amount of non-standard ceiling tiles that needed to be re-located
“Well the job has gone well, we love the new lighting and its made a huge difference. Compliments to your team and thank you”.   

Martin Cox Director AMI Marine

Cardmasters Cardboard Engineering

Hook Hampshire

When upgrading the clients premises it was important to improve both the lighting and also make good a large number of water damaged tiles whilst providing a cost effective solution

The full site upgrade was completed with the absolute minimum fuss and disturbance for the client despite a large volume of product being present and awaiting despatch, having been manufactured in preparation for the surge in demand over the Christmas holidays.

British Diamond Wire Company

Poole Dorset

Completed in two stages the client needed to elevate the existing lux levels which had naturally reduced as the traditional fluorescent tubes had aged

filieres-diamants-balloffet

Replacing multiple 1200 x 600 units each fitted with 4  x 36 watt lamps offered the opportunity to make significant savings following the upgrade.

A high performance surface mounted LED batten was selected for the installation and the dramatic reduction in power consumption meant the project covered the full project cost in under 12 months whilst more than doubling the light output

Packaids Ltd

Twyford Reading Berkshire

Both Quality and Uniformity of light were critical to the success of this installation

Although carried out over 4 working days the installation was carefully planned and as such had very little impact on the day to day activities of the client despite it being a particularly busy time of year. Needless to say the client was delighted with the results

Thank you for the installation. It had made a massive difference to our factory. Drop in any time you are in the area. 

 Steve Hutton Director 

GP & J Baker

Poole Dorset

The purpose of the project was to rationalise the lighting in the warehouse / fabric storage areas, replacing aging and assorted fluorescent lamps with a standard colour and lux level

The project was completed without interference to the working pattern of the client and included intelligent microwave activation within side aisles to maximise the client savings and improve payback.

“Absolutely delighted”        

Andy Wiffen Factory Manager

Precision Edge Ltd

Horsham West Sussex

As a bespoke specialist manufacturer of Precision Quality Industrial Blades and Machine Knives it is critical that Precision Edge Ltd have the highest standards of lighting throughout their premises.

Contracted to upgrade the whole of the West Sussex site, Commercial Light Solutions Ltd supplied a complete LED lighting solution providing higher lux levels in all departments whilst maintaining a uniform light colour throughout the site.

This upgrade was invaluable in further improving on the high standards that Precision Edge have set themselves and as such benefiting their quality focused client base.

Lascar Electronics

Salisbury Wiltshire

Greenlight-LED were invited to tender for the upgrade of both offices and the main reception area at the clients prestigious Whiteparish offices

Of particular importance was the ability to react quickly to accommodate a very short  period between surveying and installing.

imag0338

We are pleased to say that we achieved all that the client required and exactly on time and the client was extremely satisfied

Access / Toomers

Downton Salisbury Wiltshire

A Full Site Upgrade Of A Market Leading Steel Fabricator – Supplying  Major Companies and Industries Across The UK

capture

A desire to improve lighting quality across the site was the main objective of the project. However, as LED was the chosen technology the financial savings were significant and our comprehensive site survey and in-depth ROI projections indicated savings of almost 80% in the future lighting costs, post upgrade.

Needless to say the effect has been dramatic and the client is delighted with the outcome

Trowtronics

Southampton Hampshire

Trowtronics is a family-run business, based in Southampton Hampshire that prides itself on providing excellent service across a wide portfolio of major national and international customers.

Not surprisingly Trowtronics expect their suppliers and contractors to match their own exacting standards, and when we were awarded the contract to carry out a factory wide upgrade we knew only the best would do.

It was also critical that production was not affected by the upgrade and so all work was carried out over the weekend break.

Following the completion of the installation we were absolutely delighted to receive the following comment from the Directors of the Company

“Thank you Greenlight for your fast, clean and reliable service”.

Sue Curtis – Director

As well as an overall improvement to the quality of light and significant financial savings Trowtronics can expect to achieve a reduction in their annual Carbon Footprint of some 10 tons.

Aquaflex Ltd

Salisbury Wiltshire

We were very pleased to win the contract to completely upgrade the Salisbury Head Offices of the UK’s Leading Swimming Pool Liner Manufacturer, Aquaflex Ltd. To ultra efficient LED Technology.

Completed during the working week, the client was particularly complimentary about the lack of intrusion by the electricians as well as the quality of workmanship.Light levels were increased significantly and the installation gave complete uniformity across the site, assisting quality and reducing waste.

Annual lighting costs were projected as reducing by 76% and CO2 savings calculated at over 22 Tons per year.

The client was delighted with the outcome.

Alform Extrusions

A complete site upgrade to replace aging 400w Metal Halide Units many of which had failed. As the company works long days the installation was completed over a single weekend to ensure no loss of production.

The results were a dramatic improvement in the quality of light and an immediate £300 per month in financial savings. In addition the upgrade provided the environmental savings that Alform were keen to achieve with an annual reduction of some 13 tons in CO2.

Centric Signs

Portsmouth

Ageing T12 fluorescent tubes and inefficient hi-bay lighting were replaced with a combination of LED units all selected to give a uniform colour across the Portsmouth site. Light levels were also increased in key areas to assist in production and quality control and this was of particular interest to Centric Management and key when selecting Greenlight-LED to upgrade the ‘whole of site’.

The project was completed with minimum disruption and the whole project provided an immediate 36% ROI. Light levels met and exceeded specification in all areas.

Rovic Engineering

Poole
The brief for this project was simple. Replace the lighting with brighter more efficient LED units and ensure that a funded project would be cost neutral. This we were pleased to confirm was achievable and without even including the additional benefit of ECA tax benefits which following installation could be claimed against corporation tax. Installation took place over a weekend and as such did not interfere with production and the results were exactly in line with the comprehensive lighting plan produced by our in-house design team.

Moores Biscuits

Bridport
Greenlight-LED was invited back in by the General Manager Mr David Winship following an earlier and successful office LED installation. The new project included the replacement of all lighting within the factory and warehousing areas. Given the need to continue production the installation team worked closely with the Moore’s Management Team to ensure minimum disruption working early and twilight shifts. The results were dramatic and Mr Winship is quoted as saying that it is one of the best decisions he has made for the business and he wishes he had upgraded earlier.

RLA Marketing

Christchurch. Dorset

A well-known marketing company operating from a very attractive period property close to Bournemouth Airport. The project involved replacing multiple failed units suspended from a vaulted and beamed ceiling. Of major concern was the fact that whilst the replacement luminaires needed to be energy efficient they should also be sympathetic to the elegant interior.

After surveying and then completing comprehensive ROI projections it was quickly shown that by upgrading to an LED solution all of the lamps could be replaced and including installation the total capital outlay recovered in savings in a little over two years.

IKON electrical contractors were engaged to install the lamps and because of the long hours of operation, IKON were able to arrange night time and weekend teams to carry out the works whilst giving very little disturbance to the working pattern of RLA.

The product chosen was the ALAE panel and not only did the elegant design fit well within the building but the performance of the lamps gave a 30% increase in lux levels at a75% reduction in running costs and 70% reduction in CO2 production to generate and distribute the electricity used by RLA Marketing.

Needless to say the client was delighted.

Way Group / Fund Managers

Bournemouth

After an initial meeting to discuss problems with poor lighting in the administration office it was agreed to conduct a trial by replacing 6 of the quad units in a suspended ceiling with 4 ELP66 600 x 600 units. After delivering and installing the replacement lights, and after only 1 hour of use, the improvement was considered so dramatic that the trial was cancelled and a request made for the rest of the units to be delivered and installed ASAP.

As well as the significant cost savings a major consideration was the lack of heat generated by the LED units which had been a major problem previously.

Diametric Technical

Swanmore, Hampshire

A complete replacement of all internal lighting at the company Head Office was agreed and commissioned.

The customer was delighted with the results especially in the production areas and also made special reference to the excellent service provided by installation company Ikon. The customer survey returned by the client gave maximum marks in all categories and specifically confirmed their willingness to recommend not just LED lighting but Greenlight-LED as the contractor.

Savings are projected as £4000 in year 1 plus a reduction of 10 tonnes of CO2 in generating the power

Mach4 Solutions

Newhaven

Greenlight-LED were contracted to redesign and upgrade the lighting at the clients Newhaven factory.

The factory floor was re-lit utilising Sunray 10 units and the rest of the factory fitted out with Lumirod4, Skylight and Glow units.

The client was extremely pleased with the increased light levels as well as the convenience of PIR controls in areas of lower use. It was also an opportunity to improve the routing and fixing of many of the existing cables. The installation provided a Return on Investment of almost 30% p.a.

AFS Haulage

Fair Oak

With failing external lighting and a requirement to improve the internal facilities, Greenlight-LED completed a major upgrade across the site.

As well as significant energy savings, the much improved external lighting proved to be a major deterent to petty criminals and on-going instances of night time thefts ceased almost overnight once the upgade was completed.

Alfatronix

Poole, Dorset

A well-known manufacturing facility involved in producing high quality electronic power supplies.

The factory floor was lit by 12 aging 400 watt Son-T type units. The lux levels had fallen to as low as 100 across the majority of the floor. Greenlight-LED was asked to prepare a viable alternative using LED technology. Following a factory visit and subsequent preparation of a comprehensive lighting plan 8 Highbay units were recommended as replacement and later installed. The difference was both dramatic and immediate. As well as the average lux levels increasing to 320 the projected savings were over 92% on running coats and 85% on carbon emissions.

Payback is conservatively estimated as just over 1 year.

Book your FREE no obligation Commercial Lighting Audit online today

or give us a call 01202 862679 if you prefer

LED Lighting Specialist for Commercial & Industrial Applications call 01202 862677

LIGHTING Tech-Support​

Free no obligation quotation ...

 

Join out monthly newsletter and receive news on discounts on our Commercial LED Lighting

Greenlight LED


Home
About
Services

Finance
Managed Installs
Lighting Designs
Lighting Audits

News
Savings Calculator
Contact

Contact


⌂ Greenlight LED
Arena Centre, Nimrod Way
Ferndown Dorset BH21 7UH
✆ 01202 862676
info@CommercialLedLightingInstallers.uk

© Commercial Light Solutions Ltd t/a Greenlight LED 2017. All rights reserved | Terms & Conditions
Registered office address: C14 Arena Centre Nimrod Way, East Dorset Trade Park, Wimborne, Dorset, England, BH21 7UH
Company number: 08898633